Tandem Office Building
Location
5 Matei Millo Street, Bucharest
Details
Premium offices Class A buildings, consisting of a leasable area of almost 19,677 square meters and 3 basements
Services
Execution of Ventilation and Air Conditioning Systems
Project
Shell and Core
Year/duration
2020 - 14 months
Segezha Packaging
Location
1 Poligonului Street, Ploiesti
Project
Segezha Packaging Production Plant
Services
Execution of Ventilation, Air Conditioning, Sanitary and Fire fighting Systems
Year/duration
2021 - 8 months
Sameday
Location
Bucharest Ring Road, No. Cad 55425, Rudeni Village, Chitila, Ilfov County
Project
Sameday Warehouse Chitila
Services
Execution of HVAC Systems
Year/duration
2019 - 3 months
Zentiva
Location
50 Theodor Pallady Blvd., Sector 3, Bucharest
Project
WUSTER 3 clean room design
Services
Execution of heating and cooling systems
Year/duration
2022 - 6 months
Hotel Piccadilly
Location
Mamaia Blvd., Constanta
Project
Complete refurbishment and construction of elevators pits
Services
Client representatives & Project Supervision
Year/duration
2019 - 6 months
Skanska Campus 6.2
Location
6 Iuliu Maniu Blvd., Bucharest
Services
Execution of Ventilation and Air Conditioning Systems
Details
11-storey Class A buildings, consisting of a leasable area of almost 38,000 square meters and 463 parking spaces
Project
Shell and Core
Year/duration
2019 - 12 months
Gynera Fertility Center
Location
Floreasca Park, Pipera Nr. 43 , BucHAREST
Project
Clinica De Fertilitate Gynera
Services
Execution of Ventilation, Air Conditioning, Sanitary and Fire fighting Systems
Year/duration
2022 - 2 months
SIF imobiliare
Location
46 – 48 S.V. Rahmaninov Street
Project
Headquarter office fit-out
Services
Execution of Heating, Ventilation and Air Conditioning Systems
Year/duration
2019 - 2 months
Takeda
Location
Presei Libere Square, City Gate Building, 15th Floor, Project: Headquarter office
Services
Execution of Heating, Ventilation and Air Conditioning Systems
Project
Takeda Headquarter Fit-out
Year/duration
2019 - 1 months
Microsoft Romania
Location
6 Iuliu Maniu Blvd., Skanska Campus 6.2 and 6.3 Buildings
Services
Execution of Ventilation and Air Conditioning Systems
Project
Microsoft Romania Headquarter fit-out
Year/duration
2020 - 10 months
Telekom
Location
5 Matei Millo Street, Bucharest
Services
Execution of Ventilation and Air Conditioning Systems
Project
Telekom Romania Headquarter fit-out
Year/duration
2021 - 6 months
City Gate Reception
Location
Presei Libere Square, City Gate Building, 15th Floor,
Project
Complete renovation of the main hall
Services
Execution of ventilation, air conditioning, sanitary and fire extinguishing systems
Year/duration
2021 - 2 months
Farmavet
Location
Iride Business Park Bulevardul Dimitrie Pompeiu 9-9A, Bucharest 020335
Services
Execution of ventilation, air conditioning, sanitary and fire extinguishing systems
Project
Headquarter office fit-out
Year/duration
2021 - 2 months
HP
Location
myhive Metroffice B-dul Dimitrie Pompeiu 5-7
Services
Execution of ventilation, air conditioning, sanitary and fire extinguishing systems
Project
Headquarter office fit-out
Year/duration
2021 - 2 months
BCR
Location
Upground Business Center, Strada George Constantinescu 3
Services
Execution of ventilation, air conditioning, sanitary and fire extinguishing systems
Project
BCR tenant fit-out
Year/duration
2021 - 2 months
Aquavia
Location
myhive Metroffice B-dul Dimitrie Pompeiu 5-7
Project
Headquarter office fit-out
Services
Execution of ventilation, air conditioning, sanitary and fire extinguishing systems
Year/duration
2021 - 2 months
Ubisoft Craiova
Location
Electroputere Business Park Calea București 80, Craiova
Services
Execution of Ventilation, Air Conditioning, Sanitary and Fire fighting Systems
Project
Ubisoft tenant fit-out
Year/duration
2022 - 4 months
Bloc Sebastian
Location
Calea 13 Septembrie 179
Services
Underground parking ventilation & smoke exhaust with jet-fans system
Project
Smoke exhaust systems
Year/duration
2019 - 2 months
Global Residence
Location
451 – 471 Mihai Bravu Blvd, Bucharest
Services
Execution of SHEV Systems and Fire Detection System. Execution of heating, ventilation and air conditioning systems. Documentation of the fire permit and coordination of disaster tests
Project
Apartments and Comercial areas
Year/duration
2020 - 6 months
Platinum Towers
Location
Dealul Cucului 36 Street, Bucharest
Project
Apartments and shopping areas
Services
Execution of fire extinguishing networks, sewerage, water supply, heating, ventilation, air conditioning and exteriors for three high blocks
Year/duration
2021 - 16 months
Athenee Palace Hilton – New building
Location
1-3 Episcopiei Street, Bucharest
Services
Execution of Ventilation and Air Conditioning Systems
Project
Complete refurbishment Phase 1
Year/duration
2021 - 6 months
Zentiva extindere
Location
50 Theodor Pallady Blvd., Sector 3, București
Project
Construction of new technical spaces, site organization
Services
Execution of Ventilation, Air Conditioning, Sanitary and Fire fighting Systems
Year/duration
2020 - 6 months
Haier
Location
Aricestii Rahtivani (Prahova)
Project
Haier Europe Kitchen Appliances Production Plant
Services
Execution of Ventilation and Air Conditioning Systems
Year/duration
2020 - 8 months
Cluster Power
Location
Cluster Power Mischii
Project
200MW data centre
Services
Execution of Ventilation in offices and data center
Year/duration
2022 - 4 months
Eximprod grup
Location
Merei, judet Buzau
Project
Merei production plant
Services
Execution of Heating, Ventilation and Air Conditioning Systems
Year/duration
2021 - 6 months
Zentiva extindere
Location
50 Theodor Pallady Blvd., Sector 3, Bucharest
Project
Air handling unit refurbisment
Services
Air handling unit refurbisment
Year/duration
2022 - 6 months
RESTAURANT “THE CHOICE” – THE BRIDGE 3
Location
Sergent Constantin Ghercu str., no. 1b, Bucharest
Project
RESTAURANT “THE CHOICE” - BestChef
Services
Execution of mechenical instalation
Year/duration
2020 - 3 months
Taksim, Boss Mini Burgers, Pep and Pepper
Location
AFI Brasov, Baneasa Shopping City
Project
Fast-food restaurant
Services
Execution of HVAC Systems
Year/duration
2020 - 3 months
Winmarkt
Location
Carol I Street, Ramnicu Valcea
Details
After preparations, for each location the replacement of chillers was made in 3 days, from shutting down the system to final start-up of the new equipment
Project
Cooling Plant Room refurbishment
Services
Cooling Plant refurbishment for Shopping Center in Ramnicu Valcea
Year/duration
2021 - 2 months
Winmarkt
Location
15 Decebal Blvd., Piatra Neamt
Project
Cooling Plant Room refurbishment
Services
Cooling Plant refurbishment for Shopping Center in Ramnicu Valcea and Piatra Neamt
Year/duration
2021 - 2 months
Pupa Milano
Location
AFI Promenada, AFI Brasov, AFI Ploiesti, Baneasa Shopping City, City Park Constanta
Project
Complete refurbishment
Services
Design and built of HVAC and firefighting services
Year/duration
2021 - 1 months
Winmarkt
Location
Ramnicu Valcea, Braila and Ploiesti
Project
Heating Plant Room refurbishment
Services
Cooling Plant refurbishment for Shopping Center in Ramnicu Valcea, Braila and Ploiesti
Year/duration
2021 - 2 months
Sunset Lake Homes
Location
93-199 Straulesti Str. Bucharest
Services
Execution of exterior sanitary works Design of MEP works for second phase
Project
Exterior works
Year/duration
2021 - 6 months
KFC Drive Thru-Palady
Location
Bulevardul Theodor Pallady 51
Project
Exterior works and connection to the city public network
Services
Execution of exterior sanitary works and connection to the city public network
Year/duration
2021 - 2 months
Philip Morris
Location
Philip Morris Romania, Ring Road, Bucharest
Services
Execution of a new HVAC system with fancoils and complete refurbishment of existing air handling unit
Project
Office space refurbishment
Year/duration
2021 - 2 months
Lidas
Location
Cataloi, Tulcea
Services
Execution of firefighting, sewage, water supply and HVAC exterior networks
Project
Bakery plant, high bay cold storage and administrative buildings
Details
Over 6km of sewage pipes up to 1400mm diameter, more than 250 concreate manholes and over 5km of pipes for hydrants, water supply and heating
Year/duration
2022 - 6 months
Athenee Palace Hilton – Cladire istorica din 1912
Location
1-3 Episcopiei Street, Bucharest
Project
Complete refurbishment of 1912 historical building
Services
Execution of Ventilation and Air Conditioning Systems
Year/duration
2022 - 6 months
Philip Morris
Location
Philip Morris Romania, Ring Road, Bucharest
Services
Execution of a new HVAC system with fancoils and complete refurbishment of existing air handling unit
Project
Cooling towers pumping station refurbishment
Year/duration
2019 - 6 months
Militari shopping center
Location
Bd. Iuliu Maniu 560A, Bucharest, Romania
Year/duration
2022 - 6 months
Iron Mountain
Location
CT PARK Km 13 A1, Warehouse B
Project
Office area construction
Services
Execution of HVAC Systems
Year/duration
2019 - 2 months